Six-step 705-aligned workflow
Requirements Intake
705 Baseline Assessment
Design Integration
Establish the baseline security envelope by defining SCIF or SAPF parameters, classification levels, operational needs, and any TEMPEST or acoustic protection thresholds.
Develop the initial Construction Security Plan and coordinate early‑stage submittals with the designated Accrediting Official or security authority to align expectations before design progresses.
Embed physical, electronic, RF, and acoustic security specifications directly into architectural, electrical, mechanical, and structural drawings to support compliance with ICD/ICS 705 requirements.
Construction Coordination
Accreditation Preparation
Post-Accreditation Support
Provide field‑level coordination to help verify shielding continuity, acoustic performance elements, and secure‑penetration treatments as trades execute the approved design.
Assemble the Pre‑Construction Checklist, coordinate required documentation, and prepare the facility for the accrediting authority’s review by ensuring all design‑intent security measures are properly represented.
Provide ongoing lifecycle support, periodic assessments, and coordination for any required updates, re‑testing, or modernization efforts to maintain alignment with evolving secure‑facility standards.
A structured, accreditation‑ready process that supports secure‑facility compliance from initial requirements through long‑term lifecycle maintenance.
PROCESS BENEFITS
Why This Workflow Works
Reduces coordination risks across trades
Supports compliance with ICD/ICS 705 requirements
Improves design‑to‑field continuity
Minimizes post‑construction remediation
Enhances accreditation readiness
Provides lifecycle continuity for secure facilities


Reducing Jobsite Compliance Risks
Bridging Security Theory and Physical Construction
A theoretical security design becomes a liability if it cannot be executed in the field. We translate dense ICD/ICS 705 directives into clear, constructible details for mechanical, electrical, and structural trades, supporting proper implementation of RF shielding, acoustic protection, and secure‑penetration treatments during construction.
By maintaining coordination from baseline assessment through post‑accreditation support, we help reduce the field‑level issues that commonly lead to rework, schedule impacts, and accreditation challenges.
Ready to Support Your Mission?
Engage our technical team during the pre‑design phase to reduce compliance risks and strengthen constructability before construction begins.